Global Road Technology

Global Road Technology GRT are the specialists in dust control, dust suppression, soil stabilisation, erosion control, and sediment control.
(578)

GRT is an international engineering technology company focussing on providing innovative, engineered solutions for mining, civil and resource sectors offering dust control, soil stabilization, erosion control and water management solutions. We are an international, engineering technology company focusing on providing innovative products and solutions for the mining, civil, agricultural, resources,

land development, and environmental management sectors. GRT’s industry leading technology is proven to drive process efficiency, deliver sustainable infrastructure outcomes, and improve community health, safety and environmental outcomes. GRT's foundation is engineering excellence and innovation. With highly experienced chartered engineers forming the core of our team, If your not receiving an engineered solution, your dealing with the wrong company.

The full step-by-step guide covers everything your site needs: - SEG establishment - MVUE statistical analysis- Quarterl...
12/06/2026

The full step-by-step guide covers everything your site needs:

- SEG establishment
- MVUE statistical analysis
- Quarterly reporting

Don't wait for an inspector to find your gaps first.

👉 Read the full guide now: globalroadtechnology.com/rs14-compliance-guide-for-queensland-coal-mines

Council dust regulations tightening up? ⚠️ Continuous watering trucks burn through fuel and degrade your haul roads.Swit...
04/06/2026

Council dust regulations tightening up?

⚠️ Continuous watering trucks burn through fuel and degrade your haul roads.

Switch to GRT: Haul-Loc liquid polymer—it binds site dust to make suppression last 4–5x longer than water alone, cutting water consumption by up to 65%.

Test it on your own site soil! Request a Complimentary Sample Pack containing 20ml of concentrate, transfer pipettes, and simple demo instructions.

👉 Get your free kit here:
https://globalroadtechnology.com/haul-loc-sample-pack/

Why are some unsealed roads constantly failing — while others remain stable, dust-free and cost-effective for years?For ...
08/05/2026

Why are some unsealed roads constantly failing — while others remain stable, dust-free and cost-effective for years?
For councils, mining operations, agriculture and infrastructure projects, maintaining unsealed roads can become an endless cycle of grading, dust suppression and repair costs. But modern soil stabilisation technologies are changing the way roads are built and maintained.
This article explores how soil stabilisation improves road strength, reduces dust, minimises maintenance, and delivers long-term savings across unsealed road networks and infrastructure projects.

If you’re involved in road construction, mining, civil works or regional infrastructure, this is a must-read.

Read more: https://globalroadtechnology.com/soil-stabilisation-for-unsealed-roads-guide/







What happens to dust between the mine and the ship can impact far more than visibility.Across the pit-to-port supply cha...
08/05/2026

What happens to dust between the mine and the ship can impact far more than visibility.
Across the pit-to-port supply chain, uncontrolled dust can mean product loss, environmental risk, community complaints, regulatory pressure, and millions in operational costs.
From stockpiles and conveyors to ship loading operations, this article explores why effective port dust management is becoming one of the mining industry’s biggest operational priorities — and how innovative suppression technologies are helping protect both profits and the environment.

Read more: https://globalroadtechnology.com/port-dust-management-across-the-pit-to-port-chain/

Australia’s renewable energy boom is transforming thousands of hectares of land — but what happens before the first sola...
06/05/2026

Australia’s renewable energy boom is transforming thousands of hectares of land — but what happens before the first solar panel or wind turbine goes live?
From dust generation and erosion risks to environmental compliance and protecting energy output, construction challenges on renewable energy projects are far bigger than most people realise.

This article explores why dust and erosion control are becoming critical to the success of solar farms, wind farms, and battery storage developments across Australia.

https://globalroadtechnology.com/dust-control-for-solar-and-wind-farm-construction/

We already know how to prevent mine dust lung disease… so why is it still happening?These diseases are incurable—but com...
01/05/2026

We already know how to prevent mine dust lung disease… so why is it still happening?

These diseases are incurable—but completely preventable. The real issue isn’t awareness or technology, it’s whether dust is being controlled at its source, where it matters most.

Every exposure adds up over a lifetime, and every case tells the same story: dust control failed somewhere along the way.

This article challenges the industry to rethink its approach—and highlights why prevention must start before dust ever becomes airborne.

Read more: https://globalroadtechnology.com/preventing-mine-dust-lung-disease-at-the-source/

Water alone isn’t enough.Coal dust is hydrophobic – it repels water at the microscopic level. That means even high volum...
11/11/2025

Water alone isn’t enough.
Coal dust is hydrophobic – it repels water at the microscopic level. That means even high volumes of sprayed water fail to control the finest and most dangerous dust particles.

These are the particles that linger in the air…
The ones that can’t be seen…
And the ones that cause black lung and other serious respiratory diseases.

GRT Activate UG is specifically engineered to bond with coal dust - turning water into a super-activated dust suppressant that works where water alone fails.

Learn more: https://globalroadtechnology.com/grt-activate-ug/

Ever seen dust control in action? Here’s a behind-the-scenes look at a GRT 7000 demo at one of our clients' sites.From s...
22/10/2025

Ever seen dust control in action? Here’s a behind-the-scenes look at a GRT 7000 demo at one of our clients' sites.

From surface prep to final cure, this test area (32m²) was treated with a 1:2 GRT7000 mix at ~1.5 L/m². Light watering, compaction, then topical application.

After 1 hour of air drying, the result: a bonded, dust-free surface ready for use.

Swipe through to see each step in action. 👇

09/09/2025

This is what controlled dust looks like.

GRT 7000 was applied on this site 5 hours before filming. Even with active disturbance, the surface holds - no loose particles, no airborne dust.

GRT 7000 is designed to bind fine particles across a wide range of conditions:
• Concrete driveways & yards
• Construction sites
• Machinery yards

It forms a durable, water-resistant crust that eliminates the need for constant watering, while improving visibility, safety, and compliance.

Learn more: https://globalroadtechnology.com/grt7000/

Address

Unit 32/3-15 Jackman Street
Southport, QLD
4215

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm

Alerts

Be the first to know and let us send you an email when Global Road Technology posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Practice

Send a message to Global Road Technology:

Share