09/15/2026
https://wsdot.wa.gov/construction-planning/search-projects/us-101-hoh-river-bridge-emergency-repair
During an inspection, Washington State Department of Transportation bridge engineers found cracks in a support beam and the steel members under the bridge. Both support the driving surface of the bridge. Both are designed to lighten the load on the 95-year-old structure. The bridge will require both...