🔵 MILESTONE COMPLETE: HRMS AND TANKQ INTEGRATED SERVICES 🔵
A massive congratulations to our HRMS and TANKQ teams on successfully completing Stage 1, Visit 1 of the Integrated Street Drainage Cleaning Project for the Shire of Moora.
This project was a great demonstration of our two teams working together to deliver a complete, coordinated solution. HRMS established and managed the traffic-control arrangements required to protect road users, pedestrians and operational personnel.
At the same time, TANKQ deployed its specialised vacuum and high-pressure cleaning equipment to clean the stormwater drainage infrastructure safely and efficiently.
Key outcomes
✅ 18 drainage locations completed
✅ 14.3 cubic metres of waste removed
✅ Integrated traffic management and drainage-cleaning delivery
✅ Detailed photographic and location records
✅ A comprehensive close-out report provided to a very happy client
From the initial planning and mobilisation through to the onsite ex*****on and final reporting, the team represented HRMS and TANKQ with professionalism, integrity and respect. A special thank you to everyone involved in the traffic management, drainage cleaning, equipment operation, project coordination and reporting.
The positive feedback received from the client is a direct reflection of the quality of work delivered by the entire team. Thank you to the Shire of Moora for the opportunity to support the local community. We look forward to returning for the next visit and continuing to build on this successful partnership.
👏 Well done, team. This is an excellent example of HRMS and TANKQ working together to deliver a safe, professional and client-focused outcome.