08/28/2026
🚧 MAIN STREET MINUTE
Prescribed by Tangen Drug 💊
Construction is still underway on Main Street, but street parking remains available directly outside Tangen Drug. Please note that our usual handicapped parking spot is temporarily unavailable due to the roadwork.
Customers can also park in the lot behind Tangen Drug and use our back entrance to access the store. Those visiting the barber shop or salon can walk between Tangen Drug and Fiddlehead Kitchen to reach Main Street. A new crosswalk has been added right outside our front door, making it easier to safely cross the street.
Crews are currently continuing construction directly in front of the post office. Thank you for continuing to support our Main Street businesses during construction!